July Magazine 2012

PRESIDENT’S REPORT

Welcome to the winter edition of our magazine. It is a pleasure to report to you again about our Club and its concerns. The 43 floor office tower to our north and west continues its growth ahead of schedule. Current expectations are that ANZ will be in occupation by 30th June 2013 and Freehills by 31st July. It is our understanding that these two will occupy over 80% of the lettable space. A new 3 storey building to be known as 167 Castlereagh Street will be erected to our immediate north. Its roof line will be below the window level of our magnificent dining room, and sunlight will be retained from that level up to our roof. The earlier demolitions exposed parts of our northern wall which, together with our rear or western wall, will be repaired, rendered and painted (after unnecessary ducting has been removed) at no cost to your Club. I thank theGeneral Manager for his valuable assistance to me in achieving this result.
Download